Quantum DLT 7 Instrukcja Obsługi Strona 105

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 104
Chapter 10 Installing an Internal Fibre Channel Tape Drive
Confirming the Installation
DLT-S4 Product Manual 87
Figure 33 Connecting the Fibre
Channel and Power Cables
Confirming the Installation 10
To confirm the installation, turn on the host computer.
The screens displayed at power-on contain:
•BIOS
•Operating system
SCSI controller information
If the first screen displays host adapter and SCSI ID information
indicating the drive is a Quantum product, then the installation was
successful.
If the installation was NOT successful, see POST and SCSI
Troubleshooting on page 124.
Fibre Channel port
Detail of the empty Fibre
Channel port
Przeglądanie stron 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 176 177

Komentarze do niniejszej Instrukcji

Brak uwag